Off-Site Wall Panel Construction
Several decades ago JDM Structures developed the optimal construction process for wall panels in the shed and home industry. We expanded this system to offer a one-stop material and labor package that includes off-site framing and on-site installation.
Why JDM Pre-Fab Wall Panels?
WORK SMARTER
Shorten cycle times—get to the next project more quickly.
LESS LABOR
Uncover lower costs and higher profits.
EFFICIENT
The JDM method creates 30% less material waste.
BOOST PRODUCTION
Increase annual production by 25%
RELIABLE
Our wall panels show up on time and are built right the first time.
SUSTAINABLE
Off-site construction is an energy efficient and emission reducing approach.
Commercial and Residential Wall Panel Construction
Our experience has allowed us to delivered excellence time after time. Once a general contractor works with us once, they always come back to us for their next job. JDM wall panels have been framed and installed for use in
• Nursing homes & assisted living facilities
• Hotels
• Apartment housing
• Multi-family housing
• All types of residential homes
GETTING A PROJECT BACK ON SCHEDULE
Our team has taken projects like a four-story motel and completed the dry-in within 22 working days. We have also helped general contractors recover a full month on a project. Our crews are there on schedule with the materials needed.
Pre-Fab Wall Panel Resources
Test Study
Two identical 2,900 square foot ranch homes were framed side-by-side. One was stick-framed and the other used components. Here are the results.
Total Jobsite Hours to Erect
Total Jobsite Waste Generated
Total Board Foot Lumber/EWP
Stick Built
375.5 hours
15.0 cubic yards
20,643 board feet
Component
152.1 hours
0.5 cubic yards
15,052 board feet
Savings
223.4 hours
14.5 cubic yard
5,591 board feet
Off-Site Building Systems that Help You Win
The benefits are clear with off-site wall panel construction. It saves on time and money, allows for better quality and more reliable construction, and uses more sustainable practices.
Slim Cycle Time
The JDM Wall Panel System can decrease the build time by 30%.
Less On-Site Labor
Off-site panel construction can bring the need for on-site labor in the range of 40%-60%.
Decreased Material Waste
Off-site construction has been shown to create 30x less waste than the stick-framing process.
We are happy to ship our panels to a wider region (500 mile radius), but our crews only travel to the shaded service area in the map.
Panelized Construction Leaders
JDM’s long history in the building industry gives us many advantages on the job site and before we get there.
• We have one of the most seasoned and experienced work forces in the framing industry.
• JDM uses the industry-leading panel design software to create the most efficient and effective approach on each job, for a consistent and reliable result.
• We are continually buying large volumes of lumber, which allows us to have reliable access to materials and competitive and guaranteed pricing—on both materials and labor.